Full design build, this hangar was originally constructed in 2005 and an addition was completed in 2009. The 2009 addition included a total of 102,613 sqf concrete apron which was completed by a 24 hour continual pour and finish.
Full design build, this hangar was originally constructed in 2005 and an addition was completed in 2009. The 2009 addition included a total of 102,613 sqf concrete apron which was completed by a 24 hour continual pour and finish.